“Global Bali Service” company has been successfully working in construction in Bali for 5 years. Pool construction is the main branch of company’s work. The customer only needs to choose the type of pool (overflow pool construction or skimmer pool construction), type of finish (mosaic, polypropylene or composite) and filling (rides). Then our specialists will prepare a draft swimming pool design. If necessary, they will also provide the projects of water supply systems, waterproofing, ventilation, sanitation and the mosaic finish of the basin and installation of selected rides.

Our price for the construction of swimming pools depends on the choice of a particular type of object. Skimmer swimming pool is cheaper than overflow. The total cost consists of making a basin, waterproofing, selected finishes, equipment installation, commissioning and service. The bath capacity, the system of water disinfection and safety from an environmental and technical point of view is also important.

Often pool construction is carried out by amateurs who are bad in engineering. We highly recommend you to work with professionals in geodesy, geology and architecture design. This ensures that the object will be built strictly according to the project with relevant standards and building regulations and it will be for a long time. Experienced professionals provide high-quality materials, making sure the object will be ready in time. Here are the key stages of the construction works, without which it is impossible to build a modern swimming pool.

swimming pool lights

Cleaning pool

water features

wooden pool decking

THE STAGES OF WORK

7 steps for your pool

POOL CONSTRUCTION & MAINTENANCE

1. Preliminary information gathering

After applying on the website or by phone the “Global Bali Service” manager will contact you in order to clarify specific information about the place of construction and existing utilities. The desired length, width, and depth of the swimming pool is determined. A specialist comes to you to make measurements, choose the best type of construction and answer all your questions.

2. Prepare project documentation

Before the construction of swimming pools starts, the entire scope of work on the object is defined. If necessary, the process involves an architect, a planner, a geodesist and a designer. One of the main factors of a proper and a high-quality construction is the correlation of all engineering systems. The need to install lighting, counterflow and water attractions is discussed in advance. The design takes into account modern technologies and materials. A sketch is drawn that the customer approves.

POOL CONSTRUCTION & MAINTENANCE
POOL CONSTRUCTION & MAINTENANCE

3. CONSTRUCTION WORKS

Traditional construction of swimming pools in Bali begins with the digging of the pit where the formwork is installed and the structure of the pool basin is reinforced along with the installation of embedded niches for the equipment. The pit size must be at least 50 cm larger than the size of the bath on each side and technological slopes should be provided to prevent the collapse of the ground inside. Then the concrete is poured, which is carried out in two stages. First, the external formwork is performed, the bottom and walls of the pool are reinforced. All technological niches, openings, and gates are embedded. After that, the bottom of the pool is poured with concrete.

After 2-3 days the internal wall formwork is performed and loosened in order to prevent it from bursting with concrete. After that, the pool walls are poured. All concrete works take approximately from 2 to 6 weeks, depending on the size of the pool basin, difficulty (curved walls, different depth of the pool, overflow tray in the case of an overflow pool type). High-quality production of the basin is the key to the long service life of the pool. After the formwork removal is completed, the basin geometry is aligned, the pool walls are leveled and embedded equipment is installed, waterproofing and finishing is performed.

4. LEVELING THE POOL WALLS WITH A PLASTER LAYER

After pouring the concrete basin, it is kept like that for at least seven days for the initial setting of concrete. Then you can start leveling the walls and bottom of the swimming pool. First you wash off the cement slurry. Then use a notched trowel to apply tile adhesive on the walls and the bottom of the pool to improve the bonding properties between the concrete and a plaster mix. Then you install a screed strip that will be used to level the basin. Bath is leveled according to the vertical and horizontal levels (deviations no more than 1-2 mm) rounded in the upper areas of steps and sides of the pool to prevent further feet cuts with sharp corners when facing the mosaic. After leveling, the embedded parts of the pool equipment are installed and filled with the solution. This type of work takes 2-6 weeks depending on the size and complexity of the concrete basin. After performing the leveling geometry of the basin, the installation of embedded equipment, waterproofing and finishing is performed.

POOL CONSTRUCTION & MAINTENANCE
POOL CONSTRUCTION & MAINTENANCE

5. pool equipment installation

Installation of equipment is divided into two stages, that in installed directly into the pool and that is installed in the technical room. For the full functioning the following communications must be connected to the pool equipment: water supply, electricity and drainage system. Installation of equipment is performed in the technical room after finishing the technical areas. Usually it is performed at the same time as the pool bath finishing. It takes 5-30 business days depending on the number of components of the equipment.

6. Finishing works

Finishing work includes plastering, waterproofing and finishing the pool. Special materials are used to improve adhesion of concrete. It is also necessary to use plasticizers to avoid cracks in the plaster layer. Waterproofing should be two-component with the use of reinforcement with alkali-resistant mesh. After waterproofing works the pool is filled with water for 3 days to check for leaks. The last step is finishing the pool with mosaics or tiles. This is the final stage of the finishing works. When finishing the bath, materials with shades of blue, light blue and white colors are used. When tiling and grouting mosaics or tiles, we use adhesive and grout formulas that are perfect for use in the aquatic environment of the basin.

POOL CONSTRUCTION & MAINTENANCE
POOL CONSTRUCTION & MAINTENANCE

7. PRE-COMMISSIONING AND COMMISSIONING

The final stage of swimming pool construction in Bali is a repetition of all stages on the object as a test. The basin is again filled with water, it is checked for smooth operation and perfect condition of all systems. Threaded connections are checked for leaks and distortions. Installed sensors, thermostats, pressure gauges, electrodes that control the water level, chlorine and pH probes are checked as well.

Our company provides warranty on all types of construction and installation works. We are ready to provide service of the construction and installation of the pool in Bali, as well as supervision of the construction of your pool. In spite of the described sequence of actions and the apparent simplicity in the construction of concrete pool, you will definitely need all the necessary experience, knowledge of modern technologies and the practical skills. The timing of the works during the bath construction will be specified after the approval of the design of the concrete pool. Trust us with the construction of your relaxation place to the experienced staff and you will get a long-lasting, modern and beautiful pool!

POOL CONSTRUCTION & MAINTENANCE
POOL MAINTENANCE
Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…

Building
Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…

Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…

Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…

Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…

Building

Our construction company served as the Construction Manager for this 150-beds hospital, located in the northern part of Albuquerqe, NM.…